Authorised Yotta Partner

Yotta Colocation Pricing in India 2026

Yotta operates India's largest and most-certified data centre campuses — Yotta NM1 (Navi Mumbai, India's largest), Yotta D1 (Greater Noida), with capacity for hyperscale + enterprise + government workloads. Uptime Institute Tier IV certified, MeitY-empanelled, RBI Cybersecurity compliant. As authorised Yotta partner, National IT Service supplies colocation with GST invoice, rack provisioning, and ongoing managed service.

Plans & pricing (INR)

Yotta Colo Quarter Rack (10U) — From ₹15,000 / month (1 kW power) + setup

Per quarter rack

Yotta Colo Half Rack (24U) — From ₹30,000-50,000 / month + setup

Per half rack

Yotta Colo Full Rack (42U/47U) — From ₹60,000-1,20,000 / month + setup

Per full rack

Yotta Colo Cage / Private Suite — Custom (typically ₹3-30 lakh+ / month)

Per cage

Power tiers (top-up beyond included) — ₹10-12 / kWh metered

Per kW

India-specific notes

Yotta is the largest Indian-origin data centre operator (Hiranandani Group). Both Navi Mumbai (NM1) and Greater Noida (D1) campuses are MeitY-empanelled (eligible for Indian government workloads), Uptime Institute Tier IV certified, and SEBI/RBI compliant. Through National IT Service you get INR + GST billing, rack provisioning, cross-connect orchestration (to Tata, Airtel, Jio carriers + cloud onramps to AWS/Azure/GCP), remote hands service, and managed colo operations.

How to buy

WhatsApp +91 98119 98370. We engage Yotta sales for site tour + scoping, deliver bespoke quote, project-manage equipment shipping + rack-and-stack + cabling. Typical timeline: 4-8 weeks from order to operational.

Frequently Asked Questions

Yotta vs CtrlS vs ST Telemedia vs NTT in India?

Yotta: largest Indian capacity (NM1 is the largest Indian DC), Tier IV, Indian-origin, MeitY-empanelled. CtrlS: India's largest network of Tier IV DCs (Mumbai, Hyderabad, Bangalore, Chennai, Delhi), strongest geographic spread. ST Telemedia (STT GDC): Singapore-origin, premium tier in Mumbai/Bangalore/Hyderabad/Pune/Delhi. NTT: global brand, strong India presence (Mumbai, Bangalore, Chennai, Noida, Delhi). For BFSI primary: Yotta NM1 or CtrlS. For multi-site DR: CtrlS multi-city footprint. For multinational with global continuity: NTT or STT.

For our 10-rack production environment, what is realistic cost?

Full rack × 10 × ₹80,000/month average = ₹8 lakh/month rack rent + power consumption (4-6 kW per rack × 10 = 40-60 kWh × 24 × 30 = 28,800-43,200 kWh/month × ₹11/kWh = ₹3.2-4.8 lakh/month power) + cross-connects ₹50,000-1 lakh/month + remote hands ad-hoc. Total ~₹12-14 lakh/month for 10-rack production. Annual: ₹1.4-1.7 crore.

Can we connect Yotta to AWS/Azure/GCP?

Yes. Yotta has cloud onramps (Direct Connect, ExpressRoute, Partner Interconnect) to all three hyperscalers. Cross-connect from your rack to cloud onramp typically ₹15,000-50,000/month per cloud, plus the cloud-side connection fee. Strong for hybrid cloud architectures where you keep core in colo and burst to cloud.

What about disaster recovery between Yotta sites?

Yotta NM1 (Navi Mumbai) and Yotta D1 (Greater Noida) are 1,200+ km apart — sufficient seismic + geographic separation for DR pairing. Yotta offers DC-to-DC dark fibre cross-connect at attractive rates (~₹50K-2 lakh/month for 10 Gbps DCI). Indian BFSI clients run active in NM1 with warm-standby in D1 for RBI-compliant DR.

When does colocation beat AWS/Azure for India workloads?

Predictable steady-state workloads with high compute/storage utilisation (60%+ utilisation) typically beat cloud TCO by 30-50%. Examples: production databases running 24×7, high-throughput data processing, large-storage workloads (50+ TB). Colocation loses to cloud for: bursty workloads, dev/test, anything needing global edge presence. Most Indian enterprises run hybrid: predictable in colo, variable in cloud.

Yotta colocation scoping + site tour — we project-manage from rack design to go-live in 6-8 weeks.